国产精品女仆装在线播放,亚洲第一区se,菠萝蜜视频在线观看免费观看1,天天色天天射天天操,国产主播美女视频,韩国美女魅惑视频,孤岛惊魂杨幂视频

Architectural engineering
Changle people's Hospital

 
The second phase of the ward building of Changle people's hospital is a frame shear wall structure, with the first floor underground and seventeen floors above the ground,
The total building area is 19034 square meters, and the building height is 62.1 meters. The seismic grade is grade I.
 
Won the 2012 Weifang construction site comprehensive management model project award.